Welcome to SAP Central
Would you like to react to this message? Create an account in a few clicks or log in to continue.

What happens in an actual costing run?

Go down

What happens in an actual costing run? Empty What happens in an actual costing run?

Post  michael_fico Fri Mar 23, 2012 7:54 pm

In actual costing run there is a process of single level price determination
and multi level price determination. The production price difference
variances are collected on the material ledger for each of the finished
goods and semi finished goods.

During single level price determination the price difference collected on a
single finished product is allocated to consumption. This allocation to the
consumption is not individually allocated to the good issues.
In multi level price determination the price difference is allocated to
individual goods issue. The price differences are passed on to the next
level of consumption.

The system calculates a weighted average price for the finished goods
and semi finished goods. This weighted average price is called as the
periodic unit price

michael_fico

Posts : 163
Join date : 2012-03-23

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum