How does SAP go about costing a Product having multiple Bill of materials within it?
Page 1 of 1
How does SAP go about costing a Product having multiple Bill of materials within it?
SAP first costs the lowest level product, arrives at the cost and then goes
and cost the next highest level and finally arrives at the cost of the final
product.
and cost the next highest level and finally arrives at the cost of the final
product.
michael_fico- Posts : 163
Join date : 2012-03-23
Similar topics
» What are the important Terminologies in Product Costing?:
» What does the concept of cost roll up mean in product costing context?
» How does posting happen in MM (Materials Management) during special periods?
» How do you maintain multiple shift depreciation in asset master?
» Can you assign multiple G/L accounts in the Purchase order for the same line item?
» What does the concept of cost roll up mean in product costing context?
» How does posting happen in MM (Materials Management) during special periods?
» How do you maintain multiple shift depreciation in asset master?
» Can you assign multiple G/L accounts in the Purchase order for the same line item?
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|
Mon Aug 20, 2012 4:37 pm by Admin
» Difference between Type and Like
Thu Jun 07, 2012 2:40 pm by Admin
» How to handle table control fields in Module Pool program?
Wed May 09, 2012 2:41 am by govind
» Three tables inner join in SAP
Thu May 03, 2012 4:47 pm by Uma_ABAP
» Creating table type in ABAP
Sat Apr 28, 2012 9:03 pm by Uma_ABAP
» Creating user defined types and structures in ABAP
Sat Apr 28, 2012 8:55 pm by Uma_ABAP
» Creating Dynamic Internal Table and Dynamic Field catalog in SAP-ABAP
Fri Apr 27, 2012 11:00 am by Admin
» Copy Custom PF-Status from Standard program to Custom Program in ALV
Thu Apr 26, 2012 9:52 pm by Uma_ABAP
» Calculate/find number of working days between two dates in SAP
Tue Apr 24, 2012 2:06 pm by Uma_ABAP