There are Result analysis categories in WIP (Work in Process). What do you mean by the result analysis category Reserves for unrealized costs?
Page 1 of 1
There are Result analysis categories in WIP (Work in Process). What do you mean by the result analysis category Reserves for unrealized costs?
If you are calculating the work in process at actual costs, the system will
create reserves for unrealized costs if the credit for the production order
based on goods receipts is greater than the debit of the order with actual
costs incurred. The Result analysis category RUCR (Reserves for
unrealized cost) would need to be maintained. Normally this is not
maintained in most of the companies.
create reserves for unrealized costs if the credit for the production order
based on goods receipts is greater than the debit of the order with actual
costs incurred. The Result analysis category RUCR (Reserves for
unrealized cost) would need to be maintained. Normally this is not
maintained in most of the companies.
michael_fico- Posts : 163
Join date : 2012-03-23
Similar topics
» What is a work process?What are types of work processes?
» How does SAP calculate Work in Process (WIP) in product cost by order?
» What are Planned delivery costs and Unplanned delivery costs?
» What is the configuration required for additive costs?
» How does various values( revenues and costs) flow into PA?
» How does SAP calculate Work in Process (WIP) in product cost by order?
» What are Planned delivery costs and Unplanned delivery costs?
» What is the configuration required for additive costs?
» How does various values( revenues and costs) flow into PA?
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
Mon Aug 20, 2012 4:37 pm by Admin
» Difference between Type and Like
Thu Jun 07, 2012 2:40 pm by Admin
» How to handle table control fields in Module Pool program?
Wed May 09, 2012 2:41 am by govind
» Three tables inner join in SAP
Thu May 03, 2012 4:47 pm by Uma_ABAP
» Creating table type in ABAP
Sat Apr 28, 2012 9:03 pm by Uma_ABAP
» Creating user defined types and structures in ABAP
Sat Apr 28, 2012 8:55 pm by Uma_ABAP
» Creating Dynamic Internal Table and Dynamic Field catalog in SAP-ABAP
Fri Apr 27, 2012 11:00 am by Admin
» Copy Custom PF-Status from Standard program to Custom Program in ALV
Thu Apr 26, 2012 9:52 pm by Uma_ABAP
» Calculate/find number of working days between two dates in SAP
Tue Apr 24, 2012 2:06 pm by Uma_ABAP