What are the implications if the operation scrap is maintained in the routing and if it maintained in the BOM?

Go down

What are the implications if the operation scrap is maintained in the routing and if it maintained in the BOM? Empty What are the implications if the operation scrap is maintained in the routing and if it maintained in the BOM?

Post  michael_fico Fri Mar 23, 2012 6:53 pm


If the operation scrap is maintained only in the routing, the costing lot
size is reduced by this percentage.

If the operation scrap is maintained in the BOM, the planned input (not
the output quantity) is increased and any assembly scrap is reduced.