How does SAP calculate Work in Process (WIP) in product cost by order?
Page 1 of 1
How does SAP calculate Work in Process (WIP) in product cost by order?
The system first runs through all the production order for the month and
checks for the status of each production order. If the status of the
production order is REL (Released) or PREL (Partially released) and if costs are incurred for that order system calculates WIP for the
production order.
The system cancels the WIP for the production order when the status of
the order becomes DLV (delivered) or TECO (Technically complete).
michael_fico- Posts : 163
Join date : 2012-03-23
Similar topics
» How do you calculate the cost for a By-product in SAP?
» What is the difference between a product cost collector and production order?
» Is it possible to configure 2 cost component structures for the same product in order to have 2 different views?
» How do primary costs get picked up from cost center into the cost component structure?
» What is the meaning of preliminary cost estimate for product cost collector?
» What is the difference between a product cost collector and production order?
» Is it possible to configure 2 cost component structures for the same product in order to have 2 different views?
» How do primary costs get picked up from cost center into the cost component structure?
» What is the meaning of preliminary cost estimate for product cost collector?
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|
Mon Aug 20, 2012 4:37 pm by Admin
» Difference between Type and Like
Thu Jun 07, 2012 2:40 pm by Admin
» How to handle table control fields in Module Pool program?
Wed May 09, 2012 2:41 am by govind
» Three tables inner join in SAP
Thu May 03, 2012 4:47 pm by Uma_ABAP
» Creating table type in ABAP
Sat Apr 28, 2012 9:03 pm by Uma_ABAP
» Creating user defined types and structures in ABAP
Sat Apr 28, 2012 8:55 pm by Uma_ABAP
» Creating Dynamic Internal Table and Dynamic Field catalog in SAP-ABAP
Fri Apr 27, 2012 11:00 am by Admin
» Copy Custom PF-Status from Standard program to Custom Program in ALV
Thu Apr 26, 2012 9:52 pm by Uma_ABAP
» Calculate/find number of working days between two dates in SAP
Tue Apr 24, 2012 2:06 pm by Uma_ABAP