In Costing based Profitability analysis you define costing keys. A costing
key is a set of access parameters which are used in valuation to
determine which data in Product cost planning should be read. In the
costing key you attach the costing variant.
In the costing key you specify whether the system should read the
current standard cost estimate, the previous standard cost estimate or
the future standard cost estimate or a saved cost estimate.
The configuration settings to determine this costing key is as follows:-
1) Assign costing keys to the products – Three costing keys can be
attached to a single product for a specific point of valuation, record
type, plan version.
2) Assign costing keys to Material types
3) Assign costing keys to any characteristics – You can use your own
strategy to determine the costing keys. This is through user
defined assignment tables.
key is a set of access parameters which are used in valuation to
determine which data in Product cost planning should be read. In the
costing key you attach the costing variant.
In the costing key you specify whether the system should read the
current standard cost estimate, the previous standard cost estimate or
the future standard cost estimate or a saved cost estimate.
The configuration settings to determine this costing key is as follows:-
1) Assign costing keys to the products – Three costing keys can be
attached to a single product for a specific point of valuation, record
type, plan version.
2) Assign costing keys to Material types
3) Assign costing keys to any characteristics – You can use your own
strategy to determine the costing keys. This is through user
defined assignment tables.
michael_fico- Posts : 163
Join date : 2012-03-23
Similar topics
» What are the advantages and disadvantages of Account based profitability analysis vis-à-vis costing based profitability analysis?
» What is the difference between Account based Profitability Analysis and Costing based Profitability Analysis?
» What are the configuration settings maintained in the costing variant?
» What are the steps involved before you run a cost estimate for a split valuated material?
» What is the meaning of preliminary cost estimate for product cost collector?
» What is the difference between Account based Profitability Analysis and Costing based Profitability Analysis?
» What are the configuration settings maintained in the costing variant?
» What are the steps involved before you run a cost estimate for a split valuated material?
» What is the meaning of preliminary cost estimate for product cost collector?
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
Mon Aug 20, 2012 4:37 pm by Admin
» Difference between Type and Like
Thu Jun 07, 2012 2:40 pm by Admin
» How to handle table control fields in Module Pool program?
Wed May 09, 2012 2:41 am by govind
» Three tables inner join in SAP
Thu May 03, 2012 4:47 pm by Uma_ABAP
» Creating table type in ABAP
Sat Apr 28, 2012 9:03 pm by Uma_ABAP
» Creating user defined types and structures in ABAP
Sat Apr 28, 2012 8:55 pm by Uma_ABAP
» Creating Dynamic Internal Table and Dynamic Field catalog in SAP-ABAP
Fri Apr 27, 2012 11:00 am by Admin
» Copy Custom PF-Status from Standard program to Custom Program in ALV
Thu Apr 26, 2012 9:52 pm by Uma_ABAP
» Calculate/find number of working days between two dates in SAP
Tue Apr 24, 2012 2:06 pm by Uma_ABAP