What configuration needs to done for using Mixed costing?
Page 1 of 1
What configuration needs to done for using Mixed costing?
Quantity Structure type for mixed costing must be configured. Here we
specify the time dependency of the structure type . The following options
exist
a) You have no time dependency.
b) It is based on fiscal year
c) It is based on period
This quantity structure type is then assigned to the costing version.
michael_fico- Posts : 163
Join date : 2012-03-23
Similar topics
» What is mixed costing in SAP? Give an example to explain.
» What are the configuration settings maintained in the costing variant?
» What configuration settings are available to set up valuation using material cost estimate in costing based profitability analysis?
» What are the configuration settings for calculating WIP in SAP?
» What is the configuration required for additive costs?
» What are the configuration settings maintained in the costing variant?
» What configuration settings are available to set up valuation using material cost estimate in costing based profitability analysis?
» What are the configuration settings for calculating WIP in SAP?
» What is the configuration required for additive costs?
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|
Mon Aug 20, 2012 4:37 pm by Admin
» Difference between Type and Like
Thu Jun 07, 2012 2:40 pm by Admin
» How to handle table control fields in Module Pool program?
Wed May 09, 2012 2:41 am by govind
» Three tables inner join in SAP
Thu May 03, 2012 4:47 pm by Uma_ABAP
» Creating table type in ABAP
Sat Apr 28, 2012 9:03 pm by Uma_ABAP
» Creating user defined types and structures in ABAP
Sat Apr 28, 2012 8:55 pm by Uma_ABAP
» Creating Dynamic Internal Table and Dynamic Field catalog in SAP-ABAP
Fri Apr 27, 2012 11:00 am by Admin
» Copy Custom PF-Status from Standard program to Custom Program in ALV
Thu Apr 26, 2012 9:52 pm by Uma_ABAP
» Calculate/find number of working days between two dates in SAP
Tue Apr 24, 2012 2:06 pm by Uma_ABAP